Jipu Punnen
Project Engineer at sistema sh
Pathanamthitta, Kerala, India
34 - 36 Years
(***) - *** - ****
Last Updated:
November 5 ,2019
Access Jipu's Direct Phone And Email
Company Information

No. of Employees
Industry
Similar Profiles

Ellen Harnick
Senior Policy Counsel and Western Office Director
Alex Berry
Junior Policy Counsel and Western Office Director
Jipu's Experience

sistema sh
Project Engineer
Work as project engineer of the rolling out of CDMA network in Kerala circle,India
December 2008 – July 2009

Apex group international
Site Engineer (E&I)
The objective of this KGOC project was to Lay FOC cable from Slugcatcher(Kuwait) to Al Khafji Plant(Saudi Arabia) along with gas carrying 12’ pipe for sending control signal and telecommunication signals. Our company will do all the trenches as per route drawings and survey report of KGOC. Install Hand hole/ Manholes,HDPE duct/subduct and Duct Banks at required areas. Laying the cables (Fiber optic cables),do proper test(OTDR and Light source power meter test) related to cables and backfilling of trenches. Also install cable route markers and warning tape as per standard and do Acceptance test with client(Technip)/KOC. Then prepare the test report and submit to client. We are responsible for doing Cathodic Protection(STP,FBB,EBB,HVTB and NJB)in pipeline in our Corridor .We are responsible for build two Block Valve Station(BVS) in the pipeline route. Do Solar structure installations and Panel fixing and do all related electrical cable laying ,Battery bank and junction box installation. Do install all instruments in the piping inside valve pit and connect them to instrument shelter for the controlling. After all acceptance test,finally handover to client.
December 2015 – February 2017

Alghanim International General Trading & Contracting Co. WLL
Site Engineer (E&I)
The objective of this KOC project Lay FOC cable for control and communication purpose between GCs and Substation. Our company had the responsibility to prepare the trenches as per route drawings and survey report of KOC. Install Manholes and Duct Banks at required areas. Laying the cables (both 11KV Electrical and Fiber optic cables),do proper test related to cables and backfilling of trenches. Also install cable route markers and warning tape as per standard and do Acceptance test with client(Saipem)/KOC. Then prepare the test report and submit to client
September 2013 – June 2015

ZTE
Cluster Engineer (BSS/MSS)
The objective of the project was to successfully complete the setup of CDMA network(Voice and Data) for Sistema Shyam Tele Services Ltd in India. ZTE was responsible for the site survey, BTS/BSC/MSC Installation & Commissioning, Acceptance Testing, RF drive test ,RF optimization and all type of alarm monitoring of the ZTE-BSS and MSS.
August 2009 – June 2013

Detecon International GmbH
Quantity Engineer
March 2017 – Present

2017 – Present

Jipu's Education

NSS Polytechnic College Pandalam
Dipolma, Electronics and Communication Engineering, 83%
2001 - 2004

1999 - 1999

University of Calicut
B-TECH, Electronics and Communications Engineering, 65.35%
2005 - 2008

Mahatma Gandhi University
Pre Degree, Mathematics and Science, 74%
1999 - 2001